Before
Before
Before
During
During
During
After
After
Previous
Next
Project Number: 2025
From milepost 6.9 to milepost 7
RATA Funds: $500,000
Legislative District: 35
Status:
Date Approved: 2017
Cady creek culvert is on N. Shore Road the life line to the Tahuya Peninsula.
The existing corrugated metal pipe was corroded and undersized. The inlet would plug up with debri and cause flooding to the adjacent houses.
The existing CMP was replaced with a concrete box culvert with county forces.