Project Number: 0719-01
From milepost 12.96 to milepost 13.22
RATA Funds: $695,300
Legislative District: 16
Status: PE and Design
Date Approved: 2019
The Starbuck bridge has a sufficiency rating of 16.47 and is structurally deficient. In 2012, the bridge was reconfigured to one lane to handle legal loads. This project will replace the existing structure and approach roadway. The new bridge will be a single span pre-stressed concrete structure.