Project Number: 1723-01
From milepost 1.51 to milepost 1.53
RATA Funds: $1,465,000
Legislative District: 5
Status: PE and Design
Date Approved: 2023
This project ranked in the top 33 most urgently needed replacements due to its high risk of failure based on the report of locational deficiencies and structural conditions. We have seen an increase in the pipe's deterioration, denoted by a more pronounced dip in the road. Maintenance staff continues to monitor this area for signs of pipe failure, which, if found, will result in closing the road. The small pipe impacts fish migration and restricts water flow, which causes annual flooding on nearby roadways and private property. This project will install a fish passable drainage structure and remove existing stream impediments.