Skamania - Wind River Road

Project Number: 1993
From milepost 1.99 to milepost 3.59
RATA Funds: $504,000
Legislative District: 14
Status:
Date Approved: 2018
Wind River Road is the main access road for the WKO Mill and all residences north of Conrad Lundy Jr. Bridge that drive this system into and home from work, to include the truck traffic coming off the forest.

There were sections of bleeding, wheel patching, crack seals and other deficiencies noted on the roadway and the bridge had pot holes from and patches and needed a new surface

This whole system was milled to 2/10 foot with additional areas milled down to take out delaminations to create a usable surface, the bridge had two solid joints and four asphalt plugs that needed to be ground up to and passed over to save them. We did an 0100 start time as to not affect most of the population and traffic on this paver, and were thanked by the public for the short time delays.