Project Number: 1996
From milepost 2.18 to milepost 2.35
RATA Funds: $1,242,000
Legislative District: 12
Status:
Date Approved: 2018
Salmon Creek Rd connects a large rural area with services, jobs, and schools in Okanogan.
The Statler Bridge footing was significantly undermined during high spring runoff in 2018, resulting in immediate closure of the bridge, and subsequent opening with a 15 ton weight limit until the structure was replaced.
A new structure was constructed in place of the old rubble foundation short span bridge of unknown design or original construction date. The new structure width alleviated the stream constriction.