Chelan - West Cashmere Bridge Replacement

Project Number: 2009
From milepost 0 to milepost 0.5
RATA Funds: $2,500,000
Legislative District: 12
Status:
Date Approved: 2017
This road is a vital link between Cashmere and US 2 and is the only crossing that goes over BNSF mainline track. The road is crucial for access to and from the City.


The W Cashmere Bridge (Goodwin Road) was built in 1927 and was in dire need of replacement. Inspection records showed a need for a full closure in 2022.


The new bridge restored a vital link for Cashmere and it's business community a safe route into town that crossed over BNSF tracks, the Wenatchee River and US 2. The public has shown to be very thankful this access was restored and not permanently closed.